Project Description

3M Plant Drainage System Improvement Project                 

Name & Location – Greenville, South Carolina

Short Description:

Evaluation of the existing drainage system and identification of sources of flooding throughout the plant area.  Design of retrofit to the existing system in the areas that the existing structures could not be disturbed and addition of a new conveyance system.  The design included the design of three cascading (compound) detention pond system for flood control and water quality improvement.

Following services for this project were provided:

  • Hydrological and Hydraulic Modeling
  • Site Drainage evaluation and system design
  • Erosion and Sedimentation Plans
  • Compound detention pond system design